Parallelize development. The short 6 month development time was partly a product of the quality infrastructure, but of also running significant development activities in parallel. The development team was split into design, front-end engineering, infrastructure engineering, and data migrations. In parallel they built: UI prototypes on a test backend, production UI on a simulated backend, the scalable backend, the denormalization framework, the data warehouse, and simulated load testing.