Blog de Francisco Velázquez

otro blog personal

Archive for January 2012

Fases del desarrollo de software

leave a comment »

Parallelize development. The short 6 month development time was partly a product of the quality infrastructure, but of also running significant development activities in parallel. The development team was split into design, front-end engineering, infrastructure engineering, and data migrations. In parallel they built: UI prototypes on a test backend, production UI on a simulated backend, the scalable backend, the denormalization framework, the data warehouse, and simulated load testing.

via.

 

Written by fravelgue

January 23, 2012 at 8:50 pm

Posted in development

Tagged with ,

Siempre miro el código HTML

leave a comment »

 

Written by fravelgue

January 18, 2012 at 5:36 pm

Posted in personal